The perpective I'm talking about is having a room decorated, furnished, and laid out in a way you'd be happy to live with... well... forever.
So the room that's done is: the kitchen. It was completed as near to the date of that post as makes no difference, is kitted out pretty much with all the gadgets we need, is in daily use as a kitchen, and doesn't contain any extraneous furniture or shite that really belongs somewhere else.
The same cannot be said for ANY other room at the moment:
- Rear reception room. Erstwhile dining room, currently undergoing refurbishment as a living room, but finishing that project has been delayed by a postponed flooring installation, a leak in the new radiator requiring replacement, and we haven't chosen any new furnishings or entertainment equipment for it yet.
- Front reception room. Currently the living room, but when the new living room is complete will be flipped into a dining room, therefore requiring carpet removal and another new oak floor installation
- Hall. Currently a storage space for one of the sideboards. And the radiator cover needs attaching to the wall
- Garden. Reconstruction project starts TODAY!!
- Front small bedroom. Never decorated since two months after we moved in, requires plaster reskim and decoration, plus possible fitted wardrobes and bed replacement.
- Front large bedroom. Currently without any recognisable form of bedroom furniture since the old lot was sold on eBay in August and since then we've had all our clothes in cardboard "removals" wardrobes and the contents of bedside cabinets in plastic crates, pending the new handmade bedroom furniture which won't arrive until next month.
- Rear bedroom/study. Decorated and furnished, but currently home to a huge assortment of packing crates storing things to be sold on eBay, and cardboard boxes in which to parcel them up and send them off when they ARE sold.
- Bathroom. Second room to be refurbished back in 2007, we were never really happy with the result and have recently decided to do it all over again (at least in part) to get it right.
- Attic room. Still only half decorated, now two years since it was completed.
We have often said we're glad we didn't tackle the whole house at once, like our near neighbours who have basically been living in a building site for at least as long as we've lived here. But we're not that much better ourselves when you think about it!



We've had a damp patch in the kitchen for quite a few weeks, directly above the boiler. Nikki noticed it first, where the plaster was bubbling above the kitchen window, but after a few days a larger damp patch appeared in the corner and slowly grew.
Bit of a blast from the past today: we had the chimney sweep round. We'll be fitting a living flame gas fire in the new lounge, and although we've been here 18 months and never used the grate in the dining room, we know the previous owners regularly had a fire in there, so it was certain to need doing.
No, not the old Liverpudlian crew who did Lily the Pink. *Our* scaffold. For the roof. The erection started yesterday. Imagine that! A two-day erection! Makes your eyes water.
Thank God for those night-time pees. On returning to bed around 3am this morning after one such visit, I heard a strange tapping sound. Now this old house has a variety of creaks, pops, murmurs and whistles that took quite a lot of getting used to when we first moved in, but this was a noise I hadn't heard before. I pricked up my ears and lay there in the dark, listening.