Today was a day for finishing things. The boiler refit was completed and the boiler commissioned by about 6pm, after a freezing day at home with both front and back doors open all day. In the end I shut myself in the study with only an oil heater for company but at least I was warm enough for my fingers to move over the keyboard.
With the painting complete (including retouching where the "low touch" masking tape had pulled off paint - and sometimes paper - from the edges of the peachy walls) we could move the furniture back in to spare bedroom and rehang the curtains. OK, being the original curtains they don't exactly match the rest of the room anymore, but they'll do for now. And the room needs a light fitting (one I've saved from several houses ago which has been looking for a home for almost 20 years) and some small bedside tables and a small dresser, and we haven't yet decided what to do about all the stripped doors in the house, but hey - it's decorated!)
Lunchtime was taken up with completing the assembly of the wardrobe. I reckon this has taken about nine hours to put together, but the end result looks great and we can finally take the rest of our clothes out of boxes and portable wardrobes exactly two months after moving in!
Finally, we erected and decorated the new Christmas tree. With so many cracks between floorboards we decided a long time ago that we'd give up having a real tree. We both love them but they're a pain to fetch, you can never find exactly the right shape and getting rid of them afterwards is more pain, so artificial it is. Still looks nice though and it fits the hall perfectly.
Wednesday, December 13, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment