Most of the time, procrastination is my middle name. Just occasionally though, those little niggly jobs that I usually put off forever have to be done RIGHT NOW. Today was a day for jobs like that.
1. The keyhole cover.
After decorating the hall, I replaced the brass keyhole cover on the front door. Trouble is, I didn't get it *quite* right. I reckon it was somewhere around 5° off the vertical. Not much, and not enough to make it impossible to lock/unlock the door (or I'd have had to fix it right then), but just enough to require a bit of key jiggling and make opening the door harder than it should be. Reason for procrastination? Initially, annoyance at myself for getting it wrong in the first place. Subsequently, not being arsed.
I took it off and spun it those 5°.
2. The shower light.
Our bathroom has 10 spots. Eight covering the main area of the room, on one switch. Two above the shower cubicle, operated off a separate switch. One of those two blew a few weeks ago. Reason for procrastination? In the 4 years since the bathroom was reconstructed, I've not had to replace one of these bulbs, so I don't know the type and I've been constantly forgetting to (a) bring the stepladder upstairs and (b) pull one of the bulbs on a shopping day so we can be sure of having spares.
I pulled a bulb from the eight and swapped it with the blown dude, checked our extensive collection of random spares, found a match and replaced it.
Umm... that's it. Fish will need a 50% water change on Wednesday which will last them until we get back, at which point I'll do another 50% change. But other than that we're all set.
The rest of the morning was taken up with lawn mowing and a spot of digging, leaving the afternoon free to watch Glorious 39 and Eternal Sunshine of the Spotless Handkerchief. I'd not seen Glorious 39 before. Definitely one for the eBay pile - we won't be wanting to watch it a second time!
Sunday, April 17, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment