Although it felt like ages, it was less than two weeks between completion of the main kitchen fit and the final arrival of our knobs. Since we elected to retain our AEG fridge and freezer (the only appliances left from the original kitchen), we also chose the Franke "silk steel" sink and tap, and decided therefore to continue this theme in the knobs and cup handles, which are all brushed steel.
It's hard to take an impressive photo of the kitchen from any angle, with it being so long and narrow. I've been wondering whether it would be possible to get hold of some "photo stitching" software and take a row of pics at 90deg to the units, ending up with a long photo of each side, but I've experimented with PhotoSynth and the results are patchy at best. It doesn't cope well with panoramas in small spaces, apparently, so these will have to do.
So this final stage was completed on Thursday 20 October, the day before we left for the Lakes. Apart from the small section of granite upstand under the boiler cupboard, some short lengths of oak beading around those bits of wall not covered with cupboards (which we'd intended to fit skirting board to, but changed our minds), and fitting a proper door stop to replace the lump of wood that's behind the door right now, it's... ALL DONE! :o)
Monday, October 31, 2011
Subscribe to:
Post Comments (Atom)
1 comment:
Beautiful!!
Post a Comment