I was working away all day today so reports of progress reached me over the wires - of skirting board having been fitted, ceiling and walls having a coat of undercoat, downlighters being positioned and later fitted. It was a late start for the guys - we'd agreed that they should do the decorating late on Friday so they had to stop off to collect paint and skirting board supplies - and they left at 4pm. I reckon they were restricted in what they could do until the plaster was fully dried out.
They suggested an interesting 2-4-2 configuration for the 8 downlighters in the main part of the bathroom - here you can see the 4 in the centre of the room and the two above where the wash basin will be. At the other end of the room there'll be two over the toilet.
The other two lights are in the shower enclosure and will have their own switch.