Tuesday, September 20, 2011

Kitchen fit: Day 2

Today was mainly about positioning the remaining cupboards and starting to hang the wall units.

Even without doors, the wall units took the kitchen another huge leap towards "looking right" and their consequential absence from the dining room meant a step away from it being such an obstacle course, since they were no longer blocking access to the kettle station and the cutlery drawer.

Visible progress was somewhat hampered by having to core out two walls to take the ducting for the downdraft extractor, which proved a slow and noisy task. So slow that our fitters decided to abandon the second hole halfway through, to give the drill time to cool down! Even so by clocking off time the kitchen, although still full of tools, ladders and boxes of fittings, was definitely taking shape.