I'd intended to make an early start to put the final coat on the cornice (the first coat went on in two stages during the week) and finish that before breakfast so I could progress to the colour - the bit we'd all been waiting for. Ha! I hadn't appreciated just how long it would take for the whole room. Thing is, the cornice is so detailed it effectively has nine surfaces to be painted. So each metre takes nine times as long as a metre of, for example, skirting board. I started at 7.30 and didn't finish until 11am. A late breakfast then.

But again, my estimates of elapsed time were way off. I expected to have finished the first coat by mid-afternoon, but I was having to take much greater care with the brown than I had with the white undercoat. I wanted to get the edges as near perfect as I could, which meant very slow progress with the brush along the edge of the picture rail (although the bottom edge wasn't so critical, since I always leave skirting boards 'til last).
By around 1pm I'd completed the lower section of walls and graduated to the upper section. Here progress proved even slower. Now I had two critical edges - cornice and picture rail - and I was working on a plank. I decided to complete both edging and rollering in one circuit, but this slowed me down even further, as I had to keep swapping from brush to roller. It was after 5 by the time the upper section was complete, but having already worked for so long I was determined to finish the whole room in one day.

It needs a second coat, but that's a job for another day. Me? I'm taking the day off to recuperate!
2 comments:
Nice job that.
Thanks mate. You can come and see in IRL whenever you like ;o)
Post a Comment